Key Stages of Borehole Mobilization
Site Assessment & Logistics: Hydro-geologists survey the site, identify the best location, and assess logistical challenges for heavy equipment transport.
Equipment Preparation: Drilling rigs, support vehicles, pumps, and other tools are checked, prepared, and loaded for transport.
Rana ltd Transportation: Equipment is moved to the site, considering terrain, road conditions, and cost-effective routes.
On-Site Setup: The rig is positioned, power sources established, and all components connected and tested for functionality.
Site Preparation: Clearing the area, preparing access, and setting up for drilling operations.